Our process

Six steps from first walkthrough to final coat

No mystery pricing and no surprise change orders. Here is exactly how a painting project runs with Dr Handyman Service.

Call 561-506-2278

01

Walkthrough & written scope

We measure the rooms or elevations, check moisture, note stucco cracks, rot and prior coating failures, and write down exactly which surfaces are included.

02

Colors & samples

Sheen and color are chosen with your HOA palette in mind. Sample patches go on the actual wall so you see them in Florida daylight before we order paint.

03

Protection & prep

Floors, furniture, landscaping and hardware get covered. Surfaces are washed or sanded, loose coating scraped, cracks patched, joints caulked and stains spot-primed.

04

Priming & coating

Primer where the substrate needs it, then two finish coats applied by brush, roller or spray depending on the surface, with cut lines done by hand.

05

Daily cleanup

Tools, drops and debris are cleared at the end of every working day so an occupied home stays livable throughout the project.

06

Punch list & sign-off

We walk the job with you in daylight, mark anything that needs touching up, complete it, then remove masking and hand the space back.

Want this walked through for your own home?

Tell the assistant what needs painting and when suits you. Our reception team follows up with scheduling — nothing is booked until you see a confirmation.

Call 561-506-2278
Call 561-506-2278